Anticipation
A sub is in the midst of a terrible contract with a general. As far as the sub is concerned, the general has been breaching the contract throughout. The sub is slated to start a second contract with the same general. Can it refuse the work on the second contract without being in breach? This scenario arose in The Roofing Systems Inc. v. Atlas Corp., a 2004 Ontario Superior Court of Justice decision.